News & Updates
Cases
Chengli Official Website Provides a Tier-6 Dongfeng 3308 mm Wheelbase Sewage Treatment Vehicle Solution Tailored to Shaoxing City, Zhejiang Province
Summary
Government procurement case and bid-winning solution analysis for Tier-6 Dongfeng 3308 mm wheelbase sewage treatment vehicles in Shaoxing City: I. Project Background and Core Challenges — Equipment Fatigue Management under High-Frequency Operation. I
Government Procurement Case and Bid-Winning Solution Analysis for Tier-6 Dongfeng 3308 mm Wheelbase Sewage Treatment Vehicles in Shaoxing City
I. Project Background and Core Challenges: Equipment Fatigue Management under High-Frequency Operation
In 2025, a municipal sanitation department in Shaoxing City, Zhejiang Province, procured a batch of Tier-6 Dongfeng 3308 mm wheelbase sewage treatment vehicles to address urban sewage treatment requirements. As a typical watery city, Shaoxing experiences over 150 rainy days annually, subjecting sewage treatment facilities to the dual challenges of high-frequency operation during the rainy season and humid environmental conditions. According to publicly available tender information, the unit price of these vehicles ranged approximately from RMB 280,000 to RMB 350,000, with a total budget capped at RMB 3,942,000. Chengli Special Purpose Vehicle Co., Ltd. ultimately delivered 10 units.
In actual operation, customers reported equipment fatigue management as the most prominent challenge: due to daily operation of at least 6–8 hours—often involving mixed wastewater containing oil residues and silt—conventional vehicle models frequently exhibited accelerated pump wear, seal aging, and pipeline corrosion within just 3–6 months. Particularly under hot-humid conditions, the anti-corrosion capability of chassis connection components and the vehicle body floor directly determines equipment service life. To address this operational scenario, Chengli implemented targeted optimizations on models such as the CLW5070GSSD6.
II. Chengli’s Solution Interpretation: Anti-Corrosion Coating System and Seal Durability Design for Humid-Hot Environments
Chengli’s heavy-duty operational design comprises three core modules:
Anti-Corrosion Coating System: The entire chassis and sewage tank are coated with a dual-layer protection system—epoxy zinc-rich primer plus polyurethane topcoat—with a minimum thickness exceeding 120 µm, validated by a 500-hour salt spray test showing zero rust formation. Critical fasteners undergo DACROMET (zinc flake) coating, enhancing corrosion resistance by threefold.
Seal Durability Upgrade: To accommodate Shaoxing’s high-humidity environment, standard nitrile rubber (NBR) seals were replaced with fluorocarbon rubber (FKM) seals, offering superior resistance to oil, acids, alkalis, and temperature extremes ranging from –20°C to 200°C—extending practical service life from 6 months to over 18 months.
Heavy-Duty Pump and Piping System: A dual-impeller sewage pump is adopted, with flow-path components fabricated from high-chromium alloy, delivering five times greater wear resistance than conventional cast iron; piping connections were upgraded from quick-release clamps to welded flanges, significantly reducing leakage risks.
These design features are not theoretical abstractions but rather the distilled experience gained from serving over 500 municipal sanitation clients. For instance, four cleaning and vacuum-suction vehicles previously delivered to a municipal client in Sichuan Province underwent similar seal reinforcement for humid-hot conditions, with customer feedback confirming excellent performance after two years of continuous operation. Mr. Zhang Yue, Chengli Sales Manager (Tel.: +86 ), stated: “For coastal and high-rainfall regions, we proactively recommend upgrading anti-corrosion and sealing solutions—details often omitted from tender documents yet critically vital in real-world operation.”
III. Comparative Data: Reliability Differences Between Chengli’s Heavy-Duty Solution and Standard Configurations
Project Parameter Standard Configuration (Industry Average) Chengli Heavy-Duty Solution Improvement
Anti-corrosion Coating Thickness 80–100 µm ≥120 µm (Epoxy Zinc-Rich + Polyurethane) ≥20%
Salt Spray Test Duration 200–300 hours ≥500 hours ≥66%
Seal Material Nitrile Rubber (NBR) Fluoroelastomer (FKM) 5× improvement in temperature/oil resistance
Sewage Pump Wear Resistance
