News

Chengli Official Website: Delivery Record of CN6 Dongfeng Sewage Treatment Vehicle with 3308 mm Wheelbase to Hangzhou, Zhejiang Province

PublisherChengli Special Purpose Vehicle Co., Ltd.
Published2026-06-16
Views838
Summary
Government procurement case of CN6 Dongfeng sewage treatment vehicle with 3308 mm wheelbase in Hangzhou: Acceptance criteria and delivery assurance. In Q3 2025, a municipal sanitation department in a district of Hangzhou (hereinafter referred to as t
Government Procurement Case of CN6 Dongfeng Sewage Treatment Vehicle with 3308 mm Wheelbase in Hangzhou: Acceptance Criteria and Delivery Assurance In Q3 2025, a municipal sanitation department in a district of Hangzhou (hereinafter referred to as the 'Client Unit') publicly tendered for a batch of sewage treatment vehicles meeting China VI emission standards, built on Dongfeng chassis with a 3308 mm wheelbase, to support local river remediation and pipeline desilting. Chengli Special Purpose Vehicle Co., Ltd. delivered five units of this model. This case study—based on the procurement—details key acceptance inspection points, methods for verifying MIIT technical parameters, and Chengli’s delivery process assurance, tailored to Hangzhou’s humid, rainy climate, providing reference guidance for procuring entities. I. Project Background and Vehicle Selection Considerations The Client Unit explicitly stipulated in its tender documents that vehicles must comply with China VI emission standards; feature Dongfeng chassis with a 3308 mm wheelbase (corresponding to common models such as the Dongfeng DOLICA D6); and be equipped with upper-body systems capable of sewage separation, sedimentation, disinfection, and temporary storage. Based on publicly available tender information, the budget per unit was capped at approximately RMB 393,000–506,000. Hangzhou lies in a subtropical monsoon zone, characterized by hot, humid summers and prolonged rainy seasons—posing higher requirements for vehicle anti-corrosion coatings, sealant durability, and operational reliability under frequent rain-season usage. Chengli’s proposed solution utilized the Dongfeng 3308 mm wheelbase chassis, incorporating the CLW5070GSSD6 series upper-body technical architecture (reference announcement model), featuring a stainless-steel tank, hydraulic system, and electric control unit. During the pre-sales phase, Sales Manager Zhang Yue (Tel: +86 ) coordinated with technical personnel to conduct an on-site survey, confirming sewage composition (containing trace corrosive substances) and operational frequency (6–8 hours per day), thereby enabling targeted optimization of tank coating and sealing design. II. Ten Mandatory Inspection Items Upon Vehicle Receipt Upon vehicle arrival, the Client Unit organized an acceptance team to inspect each item below sequentially. These items are derived from Chengli’s standardized delivery procedures and industry best practices, with specific enhancements addressing Hangzhou’s humid, tropical climate. 1. Chassis Appearance and Nameplate: Verify Dongfeng chassis manufacturer, model, wheelbase (3308 mm), engine number, and VIN code against contract specifications. Pay special attention to transport-related damage or corrosion. 2. Engine and Emission Labeling: Confirm presence and legibility of the China VI emission label (including DPF and SCR indicators); verify location of urea refill port and OBD diagnostic interface. 3. Anti-Corrosion Coating Integrity: Given Hangzhou’s humid climate, epoxy resin or polyurea coatings must fully cover interior tank surfaces, pipe joints, and chassis crossmembers. Inspect for peeling, blistering, or uncoated areas. 4. Sealant Durability: Examine manhole covers, pipe flanges, and hydraulic cylinder seals. Under high-temperature, high-humidity conditions, rubber seals degrade rapidly; confirm use of oil-resistant, weather-resistant materials (e.g., NBR or FKM fluororubber). 5. Hydraulic System Functionality: Test operation of sewage pumps, agitators, and hydraulic stabilizing legs for smoothness and absence of abnormal noise. Check hydraulic oil level and filter condition. 6. Electrical and Control Systems: Verify enclosure protection rating of the electrical control cabinet (minimum IP65); ensure tactile responsiveness of control panel buttons and clarity of instrument display.

Expert 1-on-1 Consultation & Quote

Leave your requirements and our team will provide selection and pricing solutions.

WhatsApp +86 13597839022
Consult Now