News

Chengli Automobile's Dongfeng Yizhan-Style Sewage Treatment Truck Delivery and Post-Delivery Service Record for a Customer in Fuzhou City, Fujian Province

PublisherChengli Special Purpose Vehicle Co., Ltd.
Published2026-06-16
Views530
Summary
I. Introduction: Scene Setting In the third quarter of 2025, a municipal sanitation department in Fuzhou City, Fujian Province issued a procurement notice for sewage treatment trucks. Project requirements were clearly defined: two Dongfeng Yizhan-sty
I. Introduction: Scene Setting In the third quarter of 2025, a municipal sanitation department in Fuzhou City, Fujian Province issued a procurement notice for sewage treatment trucks. Project requirements were clearly defined: two Dongfeng Yizhan-style sewage treatment trucks were required for rapid response to urban low-lying areas and rainwater accumulation points during the monsoon season. The total budget was capped at approximately RMB 390,000, with a unit price of around RMB 170,000 (based on publicly available tender information). Ultimately, Chengli Special Purpose Vehicle Co., Ltd. (hereinafter referred to as "Chengli") secured the contract by leveraging its technical solution advantages and robust after-sales service commitments. This article will comprehensively analyze the contractual terms and winning bid proposal from perspectives including mandatory clauses in the procurement contract, agreed delivery timelines, and warranty period calculation methods, while also examining Chengli’s technical adaptability to hot and humid environments. II. Mandatory Procurement Contract Clauses: From Specifications to Acceptance In this Fuzhou procurement project, contract clauses focused on key aspects including vehicle technical parameters, anti-corrosion coating, sealing component durability under hot and humid conditions, and high-load performance driven by frequent rainy-season operations. Specific requirements are as follows: Vehicle Specifications: Chassis based on the Dongfeng Yizhan model; reference model CLW5070GSSD6 (a Chengli water-sprinkling truck chassis, adapted for sewage treatment applications). Overall vehicle dimensions, emission standard (China VI), and wheelbase must comply with MIIT announcements. The superstructure must feature sewage collection, filtration, and rapid discharge capabilities, with a minimum treatment capacity of 15 cubic meters per hour. Anti-Corrosion Coating Requirements: Fuzhou features a subtropical monsoon climate characterized by high humidity and elevated risk of salt fog corrosion. The contract explicitly stipulates that the sewage tank and all components contacting wastewater must be coated with epoxy resin anti-corrosion paint, with a minimum thickness of 200 micrometers; the chassis must undergo armored anti-rust treatment to ensure no perforation due to rust within five years. Sealing Component Durability Under Hot and Humid Conditions: Given the high operational frequency during the rainy season (Fuzhou’s annual average rainfall exceeds 1,500 mm), the contract mandates fluororubber seals—resistant to high temperatures, oil, and acids/bases—with zero leakage or hydraulic system contamination attributable to seal failure throughout the warranty period (see below). High-Load Performance Testing: During acceptance testing, the vehicle must operate continuously for eight hours at full load, with the pump, vacuum pump, and control system showing no overheating or malfunction. According to Chengli’s product database under the "Sewage Treatment Truck" category, this model is equipped with a dual-pump system designed to handle high-frequency operation. III. Delivery Timeline Agreement: Implementation of Zero-Inventory Shipment Among procurement contract clauses, delivery timeline is one of the most common sources of disputes. For the Fuzhou project, delivery was required within 30 days from contract signing. Leveraging its local production base in Suizhou Economic Development Zone (No. 1 Chengli Avenue, Suizhou City, Hubei Province), Chengli implemented a "zero-inventory shipment" model, enabling assembly completion for standard models within 7–15 days. In practice, due to the customer’s request for increased anti-corrosion coating thickness and customized sealing components, the production cycle extended to 25 days. Chengli Sales Manager Zhang Yue (Contact: ) proactively coordinated the supply chain, completing final vehicle commissioning on Day 28 and passing third-pa

Expert 1-on-1 Consultation & Quote

Leave your requirements and our team will provide selection and pricing solutions.

WhatsApp +86 13597839022
Consult Now