News

Chengli Automobile's New Dongfeng Sewage Treatment Truck Successfully Delivered in Handan City, Hebei Province

PublisherChengli Special Purpose Vehicle Co., Ltd.
Published2026-06-16
Views686
Summary
Government procurement case of the new Dongfeng sewage treatment truck in Handan: Analysis of emergency replenishment and rapid delivery solutions. In the municipal sanitation sector, sudden equipment demands often test both the procuring party’s res
Government procurement case of the new Dongfeng sewage treatment truck in Handan: Analysis of emergency replenishment and rapid delivery solutions. In the municipal sanitation sector, sudden equipment demands often test both the procuring party’s responsiveness and the supplier’s delivery capability. This article takes an emergency replenishment case by a municipal sanitation department in Handan as its entry point, analyzing how the new Dongfeng sewage treatment truck achieved rapid delivery through an expedited tendering process to address real-world operational challenges. I. Background of the Emergency Demand: Dual Pressure from Pipeline Blockages and Environmental Inspections. In Q3 2025, a district-level street environmental maintenance unit in Handan received multiple resident complaints regarding frequent blockages in aging residential drainage pipelines, resulting in sewage overflow. Simultaneously, local environmental inspection teams mandated time-bound rectifications to enhance emergency sewage treatment capacity. The existing outdated vacuum trucks—featuring small tanks (only 3 m³) and low operational efficiency—could not meet daily treatment volume requirements. Following an urgent assessment, the unit decided to procure two new Dongfeng sewage treatment trucks, requiring triple functionality: solid-liquid separation, sewage purification, and emergency drainage—with delivery and commissioning required within 30 days. II. Expedited Tendering Process: Rapid Finalization of Technical Specifications and Budget. Due to tight timelines, the procuring entity adopted a competitive negotiation approach to streamline procedures. Key requirements included: Chassis: Dongfeng brand, compliant with China VI emission standards, meeting local environmental requirements in Handan. Superstructure Configuration: Tank capacity ≥8 m³; equipped with high-pressure cleaning pump and sewage separation system; supporting remote control operation. Delivery Timeline: Within 25 calendar days after contract signing. Budget Control: Unit price approximately RMB 280,000–350,000 (referencing publicly disclosed tender prices for comparable models). After-sales Service: Nationwide chassis warranty; lifetime service response for superstructure. Following multi-party quotations, Chengli Special Purpose Vehicle Co., Ltd. (hereinafter referred to as “Chengli”) emerged as the preferred bidder with its Dongfeng chassis-based solution featuring self-developed superstructure. The proposal was based on the official model CLW5180GSSD6 (referencing MIIT announcement parameters), featuring an effective tank volume of 8.5 m³, mounted on a Dongfeng Duolika chassis with a wheelbase of 3,950 mm, powered by a Yunnan D30TCIF1 engine delivering a rated power of 125 kW and fully compliant with China VI emission standards. III. Chengli’s Rapid Response & Delivery: From Contract Signing to Acceptance in Just 22 Days. Upon confirmation of the bid award intention, Chengli Sales Manager Zhang Yue (Tel: +86 ) led cross-functional coordination and activated the ‘green channel’ production process: Days 1–3: Finalized contract terms and received advance payment; simultaneously arranged dispatch of Dongfeng chassis inventory from Suizhou factory. Days 4–10: Superstructure workshop commenced tank welding and sewage separation system assembly, with quality inspectors monitoring progress throughout. Days 11–15: Entered final assembly and commissioning phase, including simulated extreme-condition testing (e.g., suction of high-silt-content sewage). Days 16–20: Completed full-vehicle painting, affixing of official announcement labels, and provisioning of onboard tools and operation manuals. Days 21–22: Transported via Chengli’s dedicated logistics vehicle to Handan; on-site acceptance and operator training conducted. Ultimately, both units were delivered on Day 22 after contract signing—three days ahead of the committed schedule. Customer feedback: 'Upon arrival, the veh

Expert 1-on-1 Consultation & Quote

Leave your requirements and our team will provide selection and pricing solutions.

WhatsApp +86 13597839022
Consult Now